Certificates shall include statements of applicability, certifying reports from governing agencies, industry standards, and testing agencies and applicable certificates specified in each section of the specification. State of Maryland Fire Prevention Code. Clean surfaces that come into contact with grout. Cutting, welding and burning Concrete housekeeping pads Grouting Protection of work Provisions for access Demonstration and instruction Equipment provided under another division or by others Record drawings Closeout procedures Inspections Demolition Repairs and restoration of surfaces and finishes Final cleaning Project punchout Summary of Work: Provide a complete integrated electrical system in accordance with the intent of these specifications and the accompanying drawings. "$u D2iH>`:\ &Ea Coordinate the installation of required supporting devices and set sleeves in poured in place concrete and other structural components as they are constructed. ANSI/EIA/TIA. Installer of specialized systems such as Fire Alarms, telecommunication systems, etc. In addition to the following list, submit other shop drawings as may be requested by UMB: Divisions 26, 27, & 28: Compression Wire Connectors Fire Resistant Sealant Ground Wire Surface Raceway Wireways Raceway, Boxes and Cabinets Wires and Cables Fire Alarm System: Refer to Division 28 Section Digital, Addressable Fire Alarm System for submittal requirements In instances of complex field wired systems, including but not limited to: fire alarm system, the contractor shall submit: Cut sheets of every component such as control panels, fire alarm devices, wire, etc. Machine name and specification section number of driven machine. CONCRETE HOUSEKEEPING PADS Provide concrete required for housekeeping pads under Division 23 unless otherwise noted. Coordinated Drawings: pdf or dwg file formats. The contractor shall include in his price the cost of all premium time required for outages and other work which interferes with the normal use of the building, which will be performed, in most cases, during other than normal work time and at the convenience of the University. Disconnect installed work as specified for testing. Indicate scheduling, sequencing, movement, and positioning of large equipment into the building during construction. ']xOs 0LSJ$C}q]7#y6t hs.%7fu 7~[2{& x ](>B|>LWwiy=>,?^": endstream endobj 572 0 obj <> endobj 573 0 obj <> endobj 574 0 obj <>stream Energized electrical conductors and circuit parts to which an employee might be exposed shall be put into an electrically safe work condition before an employee performs work any time the employee is within the limited approach boundary or, where an increased risk of injury from an exposure to an arc flash hazard exists. Pa>hRjf4L4)@5C'2O4)@5C'^T3}2-IT3}2-Iid>qd|'2.@5C'2& 1? mL|k; mL|%3 mL|E=j2UT362tFMf0j2fXQf62tM4)@5Ch3,IgDT362tZO4)@5Cj3,IDTme>iC5jfXqd>i?j2m4|z7j2Ou|GVvx6p+j6*|orw~~qyri{7g2a AoO{z'ZwoFOP1p(Cs&.8dnvr{x8^|\hyuba4w/Axu (p8g\n4d,K%T?Hd2nZirM0%H K y}?3S}~I4H>_yUuSxIZ C7F"T!5b~Q0; SECTION 16010 BASIC ELECTRICAL REQUIREMENTS . Provide and maintain temporary partitions or dust barriers adequate to prevent the spread of dust and dirt to adjacent areas. %%EOF Before initiating any work, a job specific work plan must be developed by the contractor. Also turn off Underlines.) endstream endobj startxref Before shipment, the power distribution panel boards, shall be tested to ensure proper operation and conformance with manufacturer's published specifications. NETA (National Electrical Testing Association). endstream endobj startxref This instruction period shall consist of not less than five (5) eight (8) hour days. NJ j5)'~# 4"{:k[k%nK0Er`@ Verify all dimensions by field measurements. shall meet the requirements of the associated spec section(s). Single row deep groove ball bearings are particularly versatile, have low friction and are optimized for low noise and low vibration, which enables high rotational speeds. 571 0 obj <> endobj APPROVED EQUAL EQUIPMENT LAYOUTS Approved Equal Equipment Layouts: The equipment layouts and the related mechanical and electrical service connections, access space and supports indicated on the construction documents represent equipment provided by the specified basis of design manufacturer and model number. This section is a Division-16 basic Electrical Materials and Methods section, and is part of each Division-16 section making reference to electrical raceways . hbbd``b`q @`W@qD%XAWH12N@ M G.|,b43f`0pXaE"zs aN B. Permit must be approved by UMB Department of Operations and Maintenance prior to performing energized work. Make all necessary investigations as to locations of utilities and all other matters which can affect the work. Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the Work. Hazards. 16010. Fully qualified and experienced in such work. All other materials removed shall become the property of the Contractor and shall be removed from the premises. Where coordination requirements conflict with individual system requirements, refer conflict to UMB. Calculations for battery capacity and voltage drop. The drawings and specifications shall be followed in layout of work. SECTION 16010 - GENERAL PROVISIONS 1.0 GENERAL CONDITIONS: All sections under this Division shall be subject to the requirements of the Architect's General Conditions - UAP Doc. DIVISION 16 SECTION 16010 ELECTRICAL BASIC ELECTRICAL MATERIALS AND METHODS 16010 - 1 PART 1 - GENERAL 1.01 CONTRACT DOCUMENTS A. Motor manufacturer, motor type or model . NFPA (National Fire Protection Association). hbbd```b``+XLVH&06K 0&_d9;H2b&Ff=~ 90 ANSI (American National Standards Inst.). Unless otherwise indicated in each specification section, contractors may submit material and equipment by non listed manufacturers provided said submittals meet the requirements of these specifications. 8&Zdl6xHc`p(N:cy$f430o"NNN_r u2Mrf\[7Hcr IT System. %PDF-1.5 % 4. 434-2007 Page 1 of 1 _____ INDEX OF SPECIFICATION 16010 Electrical, General Requirements 16122 Electrical, Wire and Cable 16133 Electrical, Conduits and Fittings 16225 Electrical, Control Panel . endstream endobj 4189 0 obj <. 16010 - 1 . Supplementary Conditions and Division-1 Specification Sections, apply to this Section. 11282 0 obj <>stream PART 1 - GENERAL . 1.01 . ?Cc\C,Ns[Tj*I3t3kZ pd(68 Ulz 0000000016 00000 n Samples shall indicate applicable specification section number and item numbers within that section. These cookies will be stored in your browser only with your consent. _^QD!;\m6~D#}g}F\jf#Mt2tNT%$PkQwJuhN)2>IL gVV[ NYo8 bT6&/"I9k8rq#|,p]UW.nD,e$#)GY9AV/8JWh(tsU T/! <<8444751DFCD0354687F9FE76EBE71065>]>> This includes but is not limited to updating Equipment and/or Material Model Numbers indicated in the specifications and adding any additional specifications that may be required by the project. specifications electrical metallic tubing (emt) t&b detailed specifications for electrical items technical specifications for electrical work, electrical specifications - mouser electronics, electrical specifications & selection guide - delco remy, 2006 introduction to electrical construction specifications, standard in progress edition electrical specifications , electrical specifications manual override, electrical specifications & selection guide, electrical accessories and specifications, specifications for electrical installations, master specifications division 26 - electrical, general specifications for electrical installations, general specifications for electrical works, installation, specifications, service, electrical diagrams. Mix grout according to manufacturer's printed instructions. Include a detailed review of the following items: Maintenance manuals, including a customized list of preventive maintenance items and annual schedule for maintenance. Power Distribution System. %%EOF Any work covered prior to any inspection in a manner which, in the inspector's opinion, precludes a complete inspection shall be uncovered at the installers cost. Submit the work permit with the outage request. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations. &F >`>a$gd$ ^ gd;F $ ["R2VhL"F{V>,r&!#NLefBRD49e6D0u4$KyL !dU00BR0Cv1 n ~F ~ Notification of completion of testing shall be sent to the COMPANY . You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience. Listing and Labeling Agency Qualifications: A Nationally Recognized Testing Laboratory (NRTL) as defined in OSHA Regulation 1910.7. Noise and vibration adjustments. }SC8/(|X.8\NspWb].uHh8w/0>uxEu$H>THbhOZd4 Prepare floor plans, elevations, and details to indicate penetrations in floors, walls, and ceilings and their relationship to other penetrations and installations. hb```,lleaX 0p7Q;0"cuLfJ 'f`^a]Qp@q 2pJHHX)3DX8\n*p. ZPwPEgjZv]QO^pV0VUE:/(@HaW#Zld$Wvm#*.fvRT!y>.eu NzL2,:JiXQ4A76r,go$r:E)&UnW /L_CB!wmS9w*y*e@cOyWKm\-"/$JRX ?wPY/p ajF-PsWMmR6i?G Cure placed grout according to manufacturer's printed instructions. Coordinate installation of large equipment requiring positioning prior to closing in the building. hb```x ,M[Vcv/?LyS:wIf{[zX#F2\3vdzDlLt0t0 h )@" 110wc {_1``Y P This category only includes cookies that ensures basic functionalities and security features of the website. END OF SECTION 260000 University of Maryland, Baltimore Bressler Research Building Seventh Floor Renovation Project No. Comply with the following requirements: Coordinate electrical systems, equipment, and materials installation with other building components. Housekeeping Pads: Pads shall be minimum of four (4) inches wider and longer than structural base of equipment being set on pad. 2 0 obj Work with the other trades to ensure the material and equipment installed as part on the electrical system will not be in conflict with the installation of material and equipment by the other trade contractors. }T+A&p~lA&K9V=Zp-8ysG.n{@K?zpW\{\ZZgZU%]M:z ^HsRoiSD-G[ 5#)\EENX6 Where pipe sleeves are installed in non-rated CMU walls fire rated sealant materials are not required. Place markers in corner of tile. . Remove conduit, hangers, supports, etc. service companies, and controlling agencies. PART 1 GENERAL RELATED DOCUMENTS Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this section and all other Electrical Specification Sections. Place grout to completely fill equipment bases. BASIC ELECTRICAL REQUIREMENTS . Cutting and patching. All adjustments and modifications shall be provided by the bidder and appropriate subcontractors at no additional cost to the project. RELATED SECTIONS SECTION Title 14200 Conveiance System 16000 Electrical Works 16010 General Provisions for Electrical Work 16110 Raceways 16120 Conduits 16200 Cables and Wires 16300 Supporting Devices 16400 Main Distribution Equipment 16500 Lighting Economy and efficiency adjustments. unless otherwise noted. 278 0 obj<>stream xref The lighting design shall have a cross-section of 2,5 mm and a circuit breaker of (1 x 10 A + N) - Minimum wire size shall be 2.5 mm. Clearances for servicing and maintaining electrical equipment. Provide the following, where applicable, in accordance with accepted trade standards and to Owners satisfaction: Replace damaged ceiling tiles. Access panels and doors are specified in the Architectural Specifications. endstream endobj startxref 4. In default thereof, owner may have such work done and charge the cost of same to the contractor. NEMA (National Electrical Manufacturers Association). GROUT Grout shall be non-shrink, high strength type, free of iron or chlorides and suitable for use in contact with all metals, without caps or other protective finishes complying with ASTMC1107, GradeB and the following: Characteristics: Post hardening, volume adjusting, dry, hydraulic cement grout, nonstaining, noncorrosive, nongaseous, and recommended for interior and exterior applications. Any conduit abandoned in concrete slabs, walls, or other inaccessible locations shall be left with a nylon pull wire. %PDF-1.5 % l!j=MO_Q7 ze|M|+LUQYm9J]o[_UfO^U|o5_`e::,k?3R j{`11rW{b@{Lw?mcrfc~b l vrOl-~jbG6+)JTz3{ {{.j~@+rin2A:SG!=,wB`q!NU mYfXR{Y The operation of electrical equipment; required to achieve an outage must be accomplished by University personnel only. Coordinate connection of electrical systems with exterior underground and overhead utilities and services. %PDF-1.6 % Arrange for chases, slots, and openings in building structure during progress of construction to allow for electrical installations. SECTION 16010 -- GENERAL PROVISIONS DEFINITIONS Accepted/Approved: Shall mean accepted by the Project Representative. afdb`dg4baTfX:r-X5)H! Install systems, materials, and equipment to conform with approved submittal data, to greatest extent possible. Conform to arrangements indicated by the Contract Documents, recognizing that portions of the Work are shown only in diagrammatic form. 8 d X 6 D Z Z Z Z r" T " " $ D " 2" 2" @ " " Z Z 6% 6% 6% " F Z Z 6% " 6% 6% " l C Z F4 8# 3 v ( 0 X # C C P 0 " " 6% " " " " " $ " " " X " " " " " " " " " " " " " X f : SECTION 260000 BASIC ELECTRICAL REQUIREMENTS Latest Update 03-10-2022. INSTALLERS QUALIFICATIONS Electrical Installer shall submit the following evidence: Five (5) comparable completed projects. Housekeeping Pads: Set all floor-mounted equipment on four (4) inch high concrete housekeeping pads, unless otherwise shown or specified. Provide installation in accordance with recognized trade organizations and standards: NEMA. Demonstrate the following: Start up. [l*/ Installers' qualifications refer to the materials and methods required for the surface and building components being patched. REFERENCED ORGANIZATIONS AND CODES The following list of abbreviations are included within the specifications and are provided as a reference. File Format: Coordination drawings shall be in a layered structure form as CAD Files or PDF Files for each floor with searchable text as follows: File Structure: The pdf or dwg files shall have separate layered structure for: Building Elements: Indicate each building element on separate layers, such as: Walls. Provide at least forty (40) hours straight time instruction to the operating personnel. Deliver all certificates to the Owner prior to final acceptance of work. Adjustment. !y-P+O`_ )q|ero-UPO]GmlQ^+RDdi*>Z %PDF-1.6 % Refer to Division 01 Section "Definitions and Standards" for definition of "experienced Installer." product data and shall indicate applicable specification section and item numbers. Provide an index chart for identification. Refer to General Requirements of Division 01 for additional requirements pertaining to Submittals and Record Drawings. Patch holes and penetrations in wood, masonry and plaster. All such outages shall be performed on other than normal duty hours. left on top of ceilings and ceiling tiles. 3. 1912 0 obj <>stream 0 qZ*`vC+6`tth?P^u^ 'EHC1ZK$q{)Q8E All existing unsealed penetrations for services passing through existing rated assemblies within the project area shall be provided with sealant materials. 3. 11-254 95% Construction Document Submission Phase January 03, 2012 BASIC ELECTRICAL REQUIREMENTS 260000 / = > ? If any items have been initialed as being completed by the Contractor and the Architect/Engineer determines that the work is not complete, the Architect/Engineer shall be reimbursed by the Contractor at his regular hourly rate for any and all items requiring revisiting of the site by the Architect/Engineer. 301 and Section 16010 of these Specifications. 904 0 obj <>stream For each electrical outage request include a photograph of the panel index schedule for each panel affected by the outage. xYsHwy+1pUd}{"!Z@{@\RQ_nM*]/UU-d&|d./lQy6y*)~]#gk6_q_T,@0RldC\EOgO+_nK|at{8u~6}QZ"%USXR_l?v0dHy $6 :r`qoL'mVXlBy~xn{tYi|"ey_jtANNkIA>e{B#(Op N7@{z#/\1a}a\'dD,B:=wT:8BT)v$8 !%KjK\=LOe:. Size and location of all electrical panels. Remove and replace defective Work. Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. These cookies do not store any personal information. ADA (American with Disabilities Act). Refer to Division 01 Section "Definitions and Standards" for definition of "experienced Installer." B. Patch finished surfaces and building components using new materials specified for the original installation and experienced Installers. Shut down. Reflected ceiling plan. Variable frequency drives. CONSTRUCTION RECORD DOCUMENTS The electrical contractor shall maintain a set of construction record documents during the construction period in accordance with Specification Division 01 Section Project Closeout. WORK PERFORMANCE All electrical work must comply with the requirements of NFPA 70 (NEC), NFPA 70B, NFPA 70E, OSHA Part 1910 subpart J, OSHA Part 1910 subpart S and OSHA Part 1910 subpart K in addition to other references required by the contract. Switch Gear. Coordinate connection of electrical services. ph p haP haU B*ph haP h8 B*ph haP haP B*ph h B*ph h"p B*ph h& B*ph hlg B*ph h+V B*ph h"S{ ho h"S{ h9}- h{\V h8 h[P h8 h9}- h8 h#y h"S{ h#y / j Perform equipment tests as indicated and directed by the manufacturer, and as specified in Section 16010 and Sections of the Specification specifying equipment and/or systems. l2f71S-K#C@EM{Wtq Where access is by means of lift out ceiling tiles or panels mark access each panel using small color coded or numbered tabs. . Provide suitable cover plates for all recessed back boxes of equipment removed and not covered by new devices. 1.2 Page 1 of 4 REFERENCES .1 American National Standards Institute/Institute of Electrical and Electronics Engineers (ANSI/IEEE). See Architectural Specification Division 07, Section Penetration Firestopping for sealant material requirements. Provide acoustical caulking to seal the annular spaces between the sleeve and the bare pipe or pipe insulation on each end with one half (1/2) inch caulking all around the annular space. Job site and worker safety are the responsibility of the contractor. h. a$gd;F $ }H5@Gj\/vLBh@.\=r+TKi3Eg:xI=V{ T`WiRcfJ1Et*kIPd$ItI}J&]IES&IKO>Snv! 2.0 GENERAL DESCRIPTION: A. hVKk@+{la b64j[`KARh3Vd$U!XLa 'f:dM%wwc@%nyS^7-ZygHmnH"*pEK&xD,wb76I]VGm)Z_j@vUMmuyhxy S[{_T ,((n&+~z?h~YrM`%Rb$I"s?)s #: +}[6 #F7fWnV={RvRz&QQ A`5~o4lo SI*XU'wSB$5)|9D xb 1mfaqs7&YDE/q$"B" Afp|ISKCyd: C#S `IzLCoqw^`rSG7*V VF7A,.V4P l#o{# in9E^mj`PcuVd5 QUALITY ASSURANCE Comply with NFPA 70 for components and installation. Remove and replace Work not conforming to requirements of the Contract Documents. The Engineer shall decide on the item and manner in which the work shall be provided. 0000005420 00000 n ph p hf h8 B* Necessary cookies are absolutely essential for the website to function properly. See underlined texts for Edits. Unless otherwise modified, provisions of General Conditions, Supplementary Conditions and Division-01 govern work under the Electrical Divisions. Outages should be scheduled a minimum of ten (10) days in advance. hVk0W=}Xl(&[Xa+ KLbHblwwdM-/cH/Iw?GJec&2%i0h2e5 }7$kFq$$2/[&4{MXymnX*paLB:lWl_-]'vYt./&veAy[rozmIted7m-z3mdSNr]McVEEy]6uN7Y G#ps(cG-RAUi,K(#XE\X* Vx\Qc `V)3KR$$%[.gg{q0he`H\b$8kP}}@Q }RVyO@T.T.tg11IQjxAFLi=d;k7H- 0000001635 00000 n @ B F G c h j ~~vi^S~Hh"S{ h0$n CJ aJ hf h;F B* 0000002433 00000 n Clean each surface or unit to the condition expected in a normal, commercial building cleaning and maintenance program. Timkens deep groove ball bearings deliver reliable performance in a wide range of applications and conditions. 0 The mark-ups shall be legibly marked in red pencil to show all changes and departures of the installation as compared with the original design. Only one submission per System Integrator will be allowed. 1.1 GENERAL. SECTION 16010 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 Description This Division includes the complete installation of power, control, instrumentation, wiring, lighting, and other electrical systems as specified in the Sections of Division 16. #Zkh f9\!A>V=#JM;:Dw. <>>> 16010 - 1 . 0000003103 00000 n PROJECT OPERATION AND MAINTENANCE MANUAL ELECTRONIC FILES Project O & M Manual File: The project OM Manual shall include one (1) electronic copy of each approved submittal and any manufacturers maintenance manuals, and all warranty certificates included in Divisions 26, 27, & 28. The Contract Documents are a single integrateddocument, and as such all Specification Sections apply. . DEMONSTRATION AND INSTRUCTIONS Demonstrate operation and maintenance of equipment and systems to Owners personnel a minimum two (2) weeks prior to date of final inspection. Listing and Labeling: Provide products specified in this Section that are listed and labeled. endstream endobj 2010 0 obj <>stream Time of instruction shall be designated by the Owner. NECA Standards of Installation DELIVERY, STORAGE, AND HANDLING Deliver products to the project properly identified with names, model numbers, types, grades, compliance labels, and other information needed for identification. to a point below the finished floors or behind finished walls and cap. B. 0000002809 00000 n Preliminary programming information. GUARANTEE/WARRANTY: All materials, equipment, etc. Cut, remove and legally dispose of selected electrical equipment, components, and materials as indicated, including but not limited to removal of electrical systems and equipment as indicated on the drawings and specifications and other electrical items made obsolete by the new Work. Install all components and equipment per manufacturers written instructions. Comply with requirements of governing regulations, franchised service companies, and controlling agencies. 4206 0 obj <>/Filter/FlateDecode/ID[<3C9B520689C7864B9A48B04B8892C8F0><70969F182CD17F458CE0C92FB6F87795>]/Index[4188 97]/Info 4187 0 R/Length 96/Prev 405976/Root 4189 0 R/Size 4285/Type/XRef/W[1 3 1]>>stream [r'9}I!tn>oW KYa jRta4UIY3z$[gR%?F5r.jPSbei})lVZHk'vMTEJ|Agdd*z. %%EOF stream Approved substitutions, Contract Modifications, RFI responses and actual equipment and materials installed. This section is a Division-16 basic Electrical Materials and Methods section, and is part of each Division-16 section making reference to electrical raceways . COORDINATION DRAWINGS General: When required participate in the preparation of the coordinated drawing effort for the project. TURF CLUB 16010-1 GENERAL PROVISIONS MASTER F:\WORDPROC\ZEIJOBS\883-001\16010 SECTION 16010 GENERAL PROVISIONS PART 1 - GENERAL Related Documents: Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to this section. The Terms Listed and Labeled: As defined in the National Electrical Code, Article 100. Refer to contract drawings where access panels have been specifically located. endstream endobj 265 0 obj<> endobj 266 0 obj<>/Encoding<>>>>> endobj 267 0 obj<> endobj 268 0 obj<>/ProcSet[/PDF/Text]/ExtGState<>>> endobj 269 0 obj<> endobj 270 0 obj<> endobj 271 0 obj<> endobj 272 0 obj<> endobj 273 0 obj<> endobj 274 0 obj<> endobj 275 0 obj<> endobj 276 0 obj<>stream HWr8}W+mY4A7[SJhhH Fo7 RX O7/?. %PDF-1.5 % Unless otherwise indicated the coordination drawings, including plans, sections, and elevations shall be prepared at a scale of not less than 1/4 inch = 1 foot- 0 inches. Remove all electrical clippings, wiring, nuts, bolts, etc. hb```b``va`2~12 3+P!tw0dgCDu/8d.bdhp!M\FuN(#]y.cC756plr3':,u B\ Also include the address, phone number and contact person for each supplier. 1.08 TESTING A. .2 This shall generally include work in the following areas: Deep groove ball bearing. At a minimum, prepare coordination drawings for all mechanical rooms, electrical rooms and substation rooms. 0 Room numbers. For compressorized equipment include an additional three (3) year Guarantee/Warranty Period. hbbd``b` $V Fg $s6e"A?a)L:= S ` + Disconnects. Unless otherwise specified, outages of any services required for the performance of this contract and affecting areas other than the immediate work area shall be scheduled at least ten days (10) days in advance with the Office of Facilities Management. Compliance with the requirements of NFPA 70E is subject to ongoing inspection by University personnel and failure to comply will result in an immediate Stop Work order being issued and enforced at the contractors expense. L1)Tj4d v"1s%H"r$-j` ,}# i`h@M=#2Km,Iu9#y9Rd$gM$d,kVoN;$cJ+_:P:X:/}2P*C2P*C2X*c2X*c2X*cvgYt_{Mw?m{_/9Kt?to5hYE^E]_n]6#_\yn|02+=0PM1@T36YaeCb.c$PfHmT18f@5i32FMfp?M NECA (National Electrical Contractors Association). NESC (National Electrical Safety Code). 1 0 obj trailer Indicate locations where space is limited for installation and access and where sequencing and coordination of installations are of importance to the efficient flow of the Work, including (but not necessarily limited to) the following: Indicate the proposed locations of electrical equipment, and materials. GROUTING Install nonmetallic nonshrink grout for electrical equipment base bearing surfaces and anchors. Refer to specification Section 16010 - "Basic Electrical Requirements: for complete work scope. M0*``mvle}vw$ms3s%)[Fpk, V7#`,kzp:dM b([0.@Sk8@KGq4EY2:":@DD L'czU4,f53( iX 89